A supplier can compare band positions across production lots if each sample has the same orientation and a measured clearance. Keep the approved photos as a reference. Photograph a coil from each new lot and put its lot and sample ID in the frame. The original photo alone cannot show what changed.
Place the same face up. Choose a feature that the operator can find again, such as the point where the lead exits the winding. If that point varies between lots, use a marked support to orient the coil and record the lead exit separately. Label each band on a copy of the reference photo. A rotated coil can make an unchanged band look misplaced.
Keepway equipment reference. For a lot comparison, photograph your own coil in the same orientation each time.
Agree the minimum clearance or permitted band location with the buyer before evaluating the next lot. Record one line per band with the lot and sample ID, band ID, reference point, required clearance, measured clearance, visible marks and decision.
Position, retention and surface marks are separate checks. Where handling matters, repeat the agreed packing or unpacking step, then inspect the lead and contact area. Use the guide to lead-end access after banding to define that check.
Send one labelled set per lot, the coil centre opening, the local bundle width and stack height where the band will pass, and the required number of bands. Mark the minimum clearance your next operation needs.
Mobile:+86-18206519878
Tel:+86-18206519878
Whatsapp:8618206519878
Email:sales@kbwmachinery.com
Add:Wanda Plaza, Fuqiao Street, Rencheng District, Jining City, Shandong Province, China