How do you release a replacement mailer roll from a second supplier?

Keepway Machinery · 26 November 2026

A replacement roll can carry the same nominal size as the approved roll yet open differently at the station. Treat a supplier change as a comparison against a known result. Ask the current team to retain an identified section of the approved film, a finished sample and the approved drawing before the last roll runs out.

Set up a reference, a candidate and a decision owner

Write the supplier, roll or lot code, drawing revision, unit, opening direction, seal layout and stated tolerance beside each sample. Mark which values come from a drawing and which were measured on film. Record the same measurement points on both samples. Ask the supplier to identify any film, seam or perforation change. Leave unspecified properties open in the approval record.

Run the known roll before blaming the replacement

  1. Use the approved roll with a reference garment, insert and fold. Log the normal opening, loading and finished seam under the supplied operating instructions. If the reference fails, pause the comparison and establish a working baseline.
  2. Trial the candidate from the identified lot under the agreed conditions. Record the first symptom: failure to present an opening, restricted entry, or contents reaching the closure. Photograph the relevant stage, then retain the finished sample and roll label.
  3. If a change is needed, record who authorized it and which roll it applies to. Repeat the reference check after the candidate when practical. Record any difference in normal operator handling.

Write down what purchasing can release

DecisionWhat purchasing records
Release the tested lotExact supplier and lot, reference pack, settings or configuration as applicable, result and approver. List the pack sizes included.
Hold the lotAffected quantity, photos, symptom, responsible contact and material to be retained. Keep the unapproved roll identifiable.
Approve only a defined useName the tested SKU or fold and limitations. Identify which remaining packs require another trial before release.

A passing roll sample cannot establish the consistency of later deliveries. Agree what an incoming check will cover and which change triggers a new test. If a quoted tolerance matters, have the film supplier write its limits and measuring method on the drawing. Use your own sample plan and acceptance criteria.

For a first-time selection, see the pre-opened bag roll approval guide. For a supplier-change review, send the two roll references and the outcome of each comparison on your horizontal apparel bagger.

Review a replacement roll for my apparel bagger