Add: Wanda Plaza, Fuqiao Street, Rencheng District, Jining City, Shandong Province, China
+86-18206519878

How to compare banding machine quotes using one approved sample

Keepway Machinery · 26 November 2026

A bander quote that includes a machine, starter rolls and an on-site trial can look more expensive than a machine-only price. Start with the pack your team signed off and ask both suppliers to price the same work. Each can propose an alternative, but give that alternative its own line and sample record.

Give the approved pack a reference both suppliers can use

Photograph the carton or stack before banding, after banding and after the agreed transfer to the next station. Label the images with the sample ID, orientation, band position, material and width. Record what stayed together, what marks are acceptable and how the end user opens it. If only one physical sample exists, keep it as the reference and send matched duplicates to the suppliers. List any differences.

Illustration of a small carton and the band across its face
Mark the band line on a photo of the actual pack. A different position can hide print or press on a different edge.

Ask for the same four lines on each quotation

Quote lineWhat the supplier should identify
Machine and setupNamed model, feed arrangement, format parts and adjustments included for the sample. List optional items separately.
ConsumablesMaterial, dimensions and length per roll, price basis and the band actually used on the approved pack. Record losses at setup separately.
Trial and acceptanceSample ID, number attempted and accepted, observations and any hand support or second pass. State who pays for a repeat trial with a changed pack.
Delivery and serviceDelivery point, commissioning scope, training, spare items and exclusions. Use the same currency and delivery basis for the comparison.

Put a changed condition back on the sample sheet

If supplier B needs a second band to prevent a stack moving, mark that result against the original sample. Ask for the cost and handling steps of the two-band method. If supplier A uses a different band material, check edge appearance and opening again. Until both offers meet the same acceptance criteria, their quoted prices describe different jobs.

For an operating-cost comparison, divide band consumed during the agreed run by accepted packs. Price that quantity using the quoted roll and unit. Keep trial waste, normal running consumption and freight visible. A free starter roll should not set the long-term rate.

For a staffed bench, see the KEEPWAY tabletop banding machine. If your reference pack has yet to be agreed, start with the mixed-size banding sample trial. Send the sample sheet with the quotation lines you need priced.

Compare my banding sample and quote scope