Add: Wanda Plaza, Fuqiao Street, Rencheng District, Jining City, Shandong Province, China
+86-18206519878

Can a robot pallet wrapper keep up with your busiest shift?

Keepway Machinery · 18 November 2026

Start with the truck departure most likely to be missed. How many pallets for that truck must be wrapped, checked and ready when loading starts? Use that deadline to test the KPW-Z600 on your own mix of loads. You can meet a daily pallet target and still miss a collection halfway through the shift.

Download the shift worksheet (Excel) See the worked example

Choose a busy shift you can reconstruct

Take one recent dispatch list and remove customer details. Record when each group became available, where it was staged and when it had to be ready to load. Use the ready-to-load cutoff agreed with dispatch and allow time for loading before the truck leaves. Include a late-arriving load or a move between stations if either is a normal part of that shift. A row of identical pallets waiting beside the wrapper leaves both delays out of the trial.

Choose examples of your recurring load types. For each, agree on the film, wrap program and finished result with the supplier. If the tallest load needs coverage over its top corners, mark those corners on a reference photo. Count each pallet once, when the agreed coverage passes inspection. A pallet sent back for another wrap enters the tally only when it passes.

A worksheet for each dispatch deadline

In the Excel worksheet, use one row per dispatch group. For a paper log, print or copy the record below for each interval. At the top, enter the trial date, wrapper and battery configuration, film, wrap program and start time. Use the same clock for the wrapper and the dispatch desk. Record the following as the work happens.

Interval from __________ to __________   |   Dispatch group __________
What to recordTrial entry
Pallets due on this departureDue ____   Ready for wrapping at ____
Outcome for this dispatch groupAccepted on time ____   Accepted late ____   Still waiting ____
Where the wrapper spent its timeWrapping ____ min   Moving ____ min   Waiting ____ min   Other ____ min
Interruptions and repeat workCause __________   Affected pallet IDs __________
Battery displayStart reading ____ at ____   End reading ____ at ____
Access to the chargerPlanned window ____   Actual start/end ____   Reason for difference __________

Assign each minute to one activity. A second wrap belongs in wrapping time, with a note explaining why it was needed. Put time at the charger in “Other” and record the same window in the last row. The four activity totals should add up to the length of the interval. If the truck is waiting while the wrapper is working elsewhere, that is moving or wrapping time for the machine.

A shift that meets the total and misses a truck

Illustrative figures. A warehouse needs 38 pallets ready for loading by 11:30 and another 34 by 16:00. At 11:30, only 36 of the first 38 have passed the wrap check. In the afternoon the team finishes the two late pallets and all 34 for the second truck. The shift produces 72 accepted pallets against a target of 72. Only 70 meet their original deadlines.

The log determines what to try next. If the two late pallets were waiting at a second station while the wrapper travelled there, repeat the morning sequence with a different station order. If they arrived after 11:30, a faster wrapper could not have met that cutoff. If their wraps needed correction, repeat with those load shapes and inspect the finished coverage.

What would justify choosing the wrapper?

Agree before the trial on the number of accepted pallets due at each departure and the battery condition needed for handover to the next shift. Check the observed end reading against the agreed handover condition. A scheduled meal break counts as a charging opportunity only if the machine can reach the charger and that window is available under the approved charging plan. A battery reading from a short demonstration gives too little evidence to predict how much work a full shift can finish.

If every departure meets its target with the agreed load mix, staffing, wrap quality and charging windows, keep the signed worksheet with the quotation. If an extra operator helped clear a queue, repeat that interval with the planned staffing. If the battery configuration or charging schedule changed, repeat the shift under the conditions you intend to buy.

For a KPW-Z600 shift and configuration review, tell us your busiest departure time, pallets due by then, load types, station locations and available charging breaks. Approximate counts are enough to start the conversation. If space between stations is the main constraint, use the travel-space diagram to mark the narrowest point on your layout.