KEEPWAY — STRAPPING MACHINE SITE-SUPPLY & ORDER BRIEF Blank buyer record, 14 October 2026. Not wiring or conversion instructions. Company / project: Installation location / destination: Facilities contact / review date: 1. PACKING REQUIREMENT Filled carton size range (L x W x H, units) / weight: Straps per carton / target accepted cartons per shift: Strap material / width / thickness / reel specification: Operator-loaded station or proposed conveyor arrangement: 2. SITE SUPPLY — confirmed by responsible facilities personnel Nominal voltage: Phase: Frequency: Source of confirmation / date: Unknown items (leave pending rather than guess): 3. EQUIPMENT SCHEDULE — complete one row per quoted unit Equipment / exact model / selected voltage-phase-frequency: Included accessories / separate equipment: Connection arrangement and installation document reference: Rated electrical requirements supplied for qualified review: Site preparation responsibility / commissioning responsibility: Quotation and order revision / approval date: 4. PRE-DISPATCH DOCUMENT CHECK Nameplate photo reference: Installation document / revision: Matches approved order? Reviewer / date: Discrepancies and written resolution before release: 5. HANDOVER Installation checked by responsible qualified personnel: Approved equipment configuration / location: Operating instructions and handover record: Open actions / owner / completion evidence: Do not open equipment or expose live parts to collect photographs. This brief supplies no cable, circuit-protection or conversion specifications. Catalogue voltage options do not establish universal input for every unit.